Pulled out of the yard and read plate by plate — where Unit 06 came from, and what is actually running inside the mast.

Unit 06 is the fourth chassis revision in the Neicrone field line. The first two generations ran wheeled platforms built for warehouse floors, not tidal mud — both stalled out within a week of live deployment. The tracked drivetrain and sealed sensor mast that replaced them have logged uninterrupted duty since.
Independently driven tracks with a sealed bogie assembly, chosen after the wheeled Gen-2 prototype stalled out in mud within its first week in the field.
Stacked stereo pair, spinning LiDAR, and a thermal channel on a mast sealed to IP66, holding calibration through wash-downs and standing water.
Perception and bandwidth-aware triage run on the unit itself, so only the rare event leaves the mast before the nightly upload window.
CAN bus, GNSS, and IMU state normalised into one queryable timeline, timestamp-aligned to every frame the mast records.